UT - DFCM: demolishing nine existing ponds, including associated structures, piping, and
Quote from John on May 31, 2026, 9:35 AMUT DFCM Construction: Prequalified General/Site Civil Stage II - Department of Natural Resources- Wildlife Resources- Wahweap Rebuild Ponds- Project #25441520 The project consists of demolishing nine existing ponds, including associated structures, piping, and electrical systems. The site will be regraded using imported fill material to raise elevations, followed by construction of four larger replacement ponds. Each pond will include a precast water control structure, catwalk, concrete access ramps, new water supply piping, and a new drainage system. All ponds will be lined with a bituminous liner. The project also includes construction of a cast-inplace concrete kettle structure with associated piping and appurtenances. A new electrical system will be installed, including nine pedestals to provide power distribution around the ponds. There will also be a small section of piping and fitting near the existing well building. Construction Cost Estimate: $4,311,983.00
demolishing nine existing ponds, including associated structures, piping, and
UT DFCM Construction: Prequalified General/Site Civil Stage II - Department of Natural Resources- Wildlife Resources- Wahweap Rebuild Ponds- Project #25441520 The project consists of demolishing nine existing ponds, including associated structures, piping, and electrical systems. The site will be regraded using imported fill material to raise elevations, followed by construction of four larger replacement ponds. Each pond will include a precast water control structure, catwalk, concrete access ramps, new water supply piping, and a new drainage system. All ponds will be lined with a bituminous liner. The project also includes construction of a cast-inplace concrete kettle structure with associated piping and appurtenances. A new electrical system will be installed, including nine pedestals to provide power distribution around the ponds. There will also be a small section of piping and fitting near the existing well building. Construction Cost Estimate: $4,311,983.00
demolishing nine existing ponds, including associated structures, piping, and