Forum Navigation
You need to log in to create posts and topics.
NV - Complete abatement and demolition of the existing Edward L Pine Middle School building
#1 · June 21, 2026, 8:24 AM
Quote from John on June 21, 2026, 8:24 AMWCSD: Demolition of Edward L Pine Middle School. Complete abatement and demolition of the existing Edward L Pine Middle School building with the removal of all associated site features, including concrete, asphalt surfaces, tennis courts, fencing, monument sign, vegetation, underground utilities, and two (2) storage containers
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
WCSD: Demolition of Edward L Pine Middle School. Complete abatement and demolition of the existing Edward L Pine Middle School building with the removal of all associated site features, including concrete, asphalt surfaces, tennis courts, fencing, monument sign, vegetation, underground utilities, and two (2) storage containers
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)