Forum Navigation
You need to log in to create posts and topics.
MA - Provincetown: Demolition and site clearing at 26 Shank Painter (Former Police Station). Removal of
#1 · May 10, 2026, 8:36 AM
Quote from John on May 10, 2026, 8:36 AMProvincetown: Demolition and site clearing at 26 Shank Painter (Former Police Station). Removal of abandoned septic system removal of underground utilities disconet from municipal sewer system and cap at stub- approve sewer connector must be used removal of all asphalt-paved parking areas grade and backfill site
Free specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
Provincetown: Demolition and site clearing at 26 Shank Painter (Former Police Station). Removal of abandoned septic system removal of underground utilities disconet from municipal sewer system and cap at stub- approve sewer connector must be used removal of all asphalt-paved parking areas grade and backfill site
Free specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)