Forum Navigation
You need to log in to create posts and topics.
MA - Lowell: Demolition of 2 Properties. removal of the buildings, the basement walls and
#1 · April 12, 2026, 8:59 AM
Quote from John on April 12, 2026, 8:59 AMLowell: Demolition of 2 Properties. removal of the buildings, the basement walls and basement floor, then fill the hole with clean fill and 3 inches of top soil. Prior to demolition, bait traps need to set up on both properties and for a minimum two weeks must be emptied and rebaited every 4 days and disposed of properly
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
Lowell: Demolition of 2 Properties. removal of the buildings, the basement walls and basement floor, then fill the hole with clean fill and 3 inches of top soil. Prior to demolition, bait traps need to set up on both properties and for a minimum two weeks must be emptied and rebaited every 4 days and disposed of properly
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)