Open Bids Requested

Forum Navigation
You need to log in to create posts and topics.

MA - Lowell: Demolition of 2 Properties. removal of the buildings, the basement walls and

Lowell: Demolition of 2 Properties. removal of the buildings, the basement walls and basement floor, then fill the hole with clean fill and 3 inches of top soil. Prior to demolition, bait traps need to set up on both properties and for a minimum two weeks must be emptied and rebaited every 4 days and disposed of properly

Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required) 

Leave a Reply

Your email address will not be published. Required fields are marked *