Open Bids Requested

You need to log in to create posts and topics.

FL - Highland Beach: Marine Access Facility Construction. Demolition and clearing

 
Highland Beach: Marine Access Facility Construction.
Demolition and clearing site. • Elevated pile supported walkway utilizing standard timber piles and a micro-pile foundation system adjacent to the library with either timber or grated decking and railings. • Locking security gates at two (2) locations along the length of the elevated walkway. • Concrete ramp between the existing parking lot and the easterly terminus of the elevated timber walkway. • 15’ x 35’ dock with grated decking. • 12’ x 30’ concrete floating dock with provisions for two (2) future floating PVC docks. • Aluminum gangway to connect the 15’ x 35’ dock and the 12’ x 30’ concrete floating dock. • High speed boat lift. • Fixed mechanical pergola adjacent to the high speed boat lift. • Four (4) timber piles in the Intercoastal Waterway adjacent to the 15’ x 35’ dock.

Obtain specs to this and hundreds of demolition bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)

Leave a Reply

Your email address will not be published. Required fields are marked *