CA - Truckee Donner Public Utility District: Demolition and removal of existing steel structures and concrete
Quote from John on April 12, 2026, 9:14 AMTruckee Donner Public Utility District: Martis Valley Substation Modernization - 2026. The WORK of this Contract comprises of the following: Demolition and removal of existing steel structures and concrete foundations Grading and installation of drainage infrastructure Installation of conduits, pre-fabricated vaults and pull boxes Ground grid improvements Fencing and gate modifications, upgraded security cameras and lighting Installation and termination of high voltage cables and control wiring Removal, installation and repair of asphalt pavement Testing and commissioning of the protection and control systems Ancillary items such as fittings, low voltage electrical enclosures, locator wire, marking tape and other appurtenance
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
Truckee Donner Public Utility District: Martis Valley Substation Modernization - 2026. The WORK of this Contract comprises of the following: Demolition and removal of existing steel structures and concrete foundations Grading and installation of drainage infrastructure Installation of conduits, pre-fabricated vaults and pull boxes Ground grid improvements Fencing and gate modifications, upgraded security cameras and lighting Installation and termination of high voltage cables and control wiring Removal, installation and repair of asphalt pavement Testing and commissioning of the protection and control systems Ancillary items such as fittings, low voltage electrical enclosures, locator wire, marking tape and other appurtenance
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)