Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Wallops Island Demolition
July 20, 2007
9:59 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

NASA GSFC/WFF plans to issue an Invitation for Bids (IFB) for Wallops Island Demolition of Building E-108 at NASA's Goddard Space Flight Center, Wallops Flight Facility, Wallops Island, Virginia 23337. The scope of work for this project shall include, but is not limited to: Providing the labor, equipment and materials for the complete demolition of the 21,000 gross square foot Building E-108. Project includes removal of the building structure, building electrical, plumbing and HVAC systems, and removal of all other utilities. The project also includes the complete removal of slabs and/or foundations and for grading and grass seeding in the area where foundations and slabs are removed. The total price offered shall be the total price for work as shown on the specifications and drawings. The work shall be complete. It includes furnishing, as applicable, or may be required, all contractor

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
98 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar