Port of Seattle: Widen Arrivals Bridge Demo. Work includes: In preparation of the larger Widen Arrivals Roadway project, this project will demolish an existing bridge that connects the 4th floor of the main parking garage and the Departures Drives. Associated work includes a small amount of concrete barrier, asphalt paving, storm drainage and traffic control. The Engineer’s estimate range for this project is $900,000 - $1,800,000.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
41 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950