Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Port of Seattle: Widen Arrivals Bridge Demo. Work includes: In preparation of the larger Widen Arrivals Roadway
April 24, 2022
9:13 AM
Avatar
Admin
Forum Posts: 6249
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Port of Seattle: Widen Arrivals Bridge Demo. Work includes: In preparation of the larger Widen Arrivals Roadway project, this project will demolish an existing bridge that connects the 4th floor of the main parking garage and the Departures Drives. Associated work includes a small amount of concrete barrier, asphalt paving, storm drainage and traffic control. The Engineer’s estimate range for this project is $900,000 - $1,800,000.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
38 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3037

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19252

Posts: 27485

Administrators: JOHN: 7602, John: 6249