Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - GRAYS HABOR: Boat Launch Improvements Phase II.
December 10, 2017
8:45 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

PORT OF GRAYS HABOR : 28th Street Boat Launch Improvements Phase II.This project consists of the following major work items:Demolition of the existing boat ramp; upland demolition; excavation and debris removal; performing marine earthwork for a new ramp; furnishing and installing a sanitary sewer line and water line; furnishing and installing the stormwater system; paving including sub base and striping; providing a foundation and sidewalk and installing a Port-furnished restroom structure; furnishing and installing a floating dock including guide piles, grounding piles, a grounding structure, and precast concrete floats; providing a new ramp including a cast-in-place concrete slab on grade with sub base, steel guide frame, and precast concrete panels with bedding; providing a cast-in-place concrete abutment; and providing upland electrical improvements.

Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
35 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3041

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19392

Posts: 27626

Administrators: JOHN: 7602, John: 6389

Skip to toolbar