Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
VA - Salem, Demolition of two water towers
May 22, 2011
5:43 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

FEDERAL BID--Retrofit Water Tower and Water Distribution System - Remove two (2) existing water tanks/towers and construct a new 1.25 million gallon elevated composite water tank/tower, along with all associated pump-houses, and other components for a fully functional elevated water system. The work shall include removal of the existing towers in compliance with all regulatory requirements, installation of the new tower and tank, installation of two (2) conventionally-constructed pump-houses associated with the two water supply points, and all associated components in support of the project to provide emergency water storage capability for the Salem VA Medical Center. All work shall be completed within five hundred forty (540) calendar days from receipt of the Notice to Proceed. The cost range for this procurement is between $2,000,000 - $5,000,000. Bids due 06/22

Find complete details to this bid and more nationwide at envirobidnet.com click on link below FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
21 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3040

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19352

Posts: 27586

Administrators: JOHN: 7602, John: 6349

Skip to toolbar