Loon Mountain Bridge #212/151 Over the East Branch of the Pemigewasset River The Project generally consists of the construction of new 290-foot, 3 span, 3 lane bridge, 100 feet downstream from the existing bridge; relocation of roadway, utilities, and associated site work; coordination with NHDOT for removal of temporary bridge; demolition of remaining existing bridge Bids due 10/16