Loon Mountain Bridge #212/151 Over the East Branch of the Pemigewasset River The Project generally consists of the construction of new 290-foot, 3 span, 3 lane bridge, 100 feet downstream from the existing bridge; relocation of roadway, utilities, and associated site work; coordination with NHDOT for removal of temporary bridge; demolition of remaining existing bridge Bids due 10/16
For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required
Most Users Ever Online: 429
Currently Online:
55 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950