Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
ME - Heartland: Pollution Control Facility Rehab
February 4, 2018
8:50 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Hartland: WASTEWATER TREATMENT PROCESS UPGRADE - PHASE 1 HARTLAND POLLUTION CONTROL FACILITY TOWN OF HARTLAND, MAINE PROJECT Work under this project includes, but is not limited to, the upgrade and modification of the Hartland Pollution Control Facility's aerated lagoons, final clarifiers, and aeration delivery system and Blower Building including all temporarypumping, transfer of mixed liquor between lagoons, removal of sludge to secure landfill for disposal, demolition of existing aeration and clarifier systems, reconstruction of existing and new lagoon berms, addition of lagoon under drain, sand layer,and synthetic liner, expansion of Blower Building, replacement of aeration blowers, upgrade of clarifiers, and all demolition,earthwork, piping, concrete, masonry, metals, carpentry, doors, building modifications, insulation, electrical, HVAC, andincidentals, including all labor, equipment, and materials needed for a complete upgrade of the treatment plant's lagoons,final clarifiers, and aeration systems.Alternate Bid No. 1 includes an emergency electrical power generator, concrete pad, and associated exterior wiring /conduit for the Blower Building. (The Base Bid includes the generator transfer switch and associated interior wiring/conduit).Alternate Bid No. 2 includes a credit, if any, to utilize chain link lagoon perimeter fencing instead of the pedestrian wireguardrail specified in the Base Bid.Alternate Bid No. 3 includes the replacement of the existing secondary clarifier fiberglass domes with new aluminumdomes. The Base Bid includes removing, storing, repairing, and resetting the existing fiberglass domes.

Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
65 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3040

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19372

Posts: 27606

Administrators: JOHN: 7602, John: 6369

Skip to toolbar