Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
KY - University of Kentucky: Improve Funkhouser Building Commissioning This project will include the demolition of the existing building
January 7, 2024
9:05 AM
Avatar
Admin
Forum Posts: 6349
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

University of Kentucky: Improve Funkhouser Building Commissioning This project will include the demolition of the existing building additions, renovation of approximately 65,000 GSF of the original building, and a 64,000 GSF addition. The project will include 29,000 assignable square feet of student and maker space that will include capstone projects, maker space and shops, machine shops, student organizations, and meeting and presentation spaces. It will also include 32,000 assignable square feet of biomedical cross-disciplinary space to include biomedical engineering research labs, and offices; cross-disciplinary biomedical research labs and faculty offices for computer science, chemical and materials engineering, mechanical and aerospace engineering, and electrical and computer engineering.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
19 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3040

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19352

Posts: 27586

Administrators: JOHN: 7602, John: 6349

Skip to toolbar