Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Demolition of 3 buildings - Nisqually National Wildlife Refuge
June 29, 2006
9:54 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[FONT=Verdana]Statement of Work Building demolition and debris removal on Black River Unit of Nisqually NWR Contractor will provide all equipment and labor to perform complete demolition and removal of identified buildings down to but not including the concrete slab. Contractor will remove all material and debris including that which is inside of structures and immediately adjacent to the structures listed below. Contractor will provide hand labor to pick up and remove debris too small to be picked up by equipment. Site will be cleaned up to a standard such that a tractor mounted with brush hog rotary mower can be driven through the site without damaging the tractor or mower while mowing. Contractor will survey all structures, trash, and debris for hazardous materials and waste including but not limited to asbestos, fuels, pesticides, creosote treated lumber, and flammables. All hazardous materials and hazardous waste must be manifested, handled, and disposed of in compliance with all applicable federal, state, and local regulations. Contractor will provide a letter itemizing all hazardous materials and waste found and its location. In addition, contractor will provide a copy of all waste manifests and recycle and landfill disposal receipts. Contractor will maximize deconstruction and reuse of materials, recycling, and salvage to the greatest extent practicable and minimize the amount of material placed in landfills. All materials and wastes will be handled and disposed of in accordance with all federal, state, and local regulations. Contractor will provide their bid per item as listed below.[/FONT]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
19 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3041

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19372

Posts: 27606

Administrators: JOHN: 7602, John: 6369

Skip to toolbar