Alabama State Port Authority: MCDUFFIE TERMINAL -DOCK 1 RAIL EXTENSION MOBILE, ALABAMA. The work consists principally of providing bonds, labor, materials, equipment, and supervision necessary for the modifications required to the existing Dock 1 for the operation of a new shiploader inclusive of all required demolition work, concrete piling installation work, concrete work, concrete bridge section installations, crane rail installations and other required crane interface modifications. Bids due 01/11/12
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
24 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 48
Members: 3040
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19372
Posts: 27606
Newest Members:
Josh, ContractorGuy, Lee, DakotaTiptonAdministrators: JOHN: 7602, John: 6369