Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Port of Port Angeles, bridge removal
June 26, 2011
5:23 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Tumwater Creek Bridge Replacement. West of South Tumwater Street and north of West Marine Drive, in the City of Port Angeles, Washington. Work shall include: removing existing timber bridges, piling, sheet piling, and other creosote treated timber and replacing them with a precast concrete bridge with sheet pile abutment, cast in place pile cap, and steel pipe piling, reconstruction of rip rap slopes, Bids due 07/19

Find complete details to this bid and more nationwide at envirobidnet.com click on link below FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
21 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19992

Posts: 28226

Administrators: JOHN: 7602, John: 6990

Skip to toolbar