Quote from
John on January 25, 2026, 9:16 AM
Central Kitsap Fire & Rescue: CKFR Station 41 project. The Work comprises the demolition of an existing 10,000 sqft fire station, existing training tower and existing site paving, the construction of an approximately 14,680 sqft, fire station. ADD ALTERNATE 1 comprises a combined Wash Bay and Fuel Station, this includes a 2,280 sqft steel canopy, equipment room, wash equipment, and a bidder designed and permitted above ground fuel tank and fuel dispensing equipment. The estimated cost range for this project is $14,500,000 ? $15,000,000
Obtain specs to this, and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
Central Kitsap Fire & Rescue: CKFR Station 41 project. The Work comprises the demolition of an existing 10,000 sqft fire station, existing training tower and existing site paving, the construction of an approximately 14,680 sqft, fire station. ADD ALTERNATE 1 comprises a combined Wash Bay and Fuel Station, this includes a 2,280 sqft steel canopy, equipment room, wash equipment, and a bidder designed and permitted above ground fuel tank and fuel dispensing equipment. The estimated cost range for this project is $14,500,000 ? $15,000,000
Obtain specs to this, and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)