Forum Navigation
You need to log in to create posts and topics.
OR - Estacada: demolition of an existing 150,000 gallon clear well, construction
#1 · March 29, 2026, 8:38 AM
Quote from John on March 29, 2026, 8:38 AMEstacada: 150,000 gallon bolted steel epoxy coated reservoir replacement project. The project includes demolition of an existing 150,000 gallon clear well, construction of a nominal 150,000 gallon epoxy coated bolted steel water storage reservoir, piping and telemetry.
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
Estacada: 150,000 gallon bolted steel epoxy coated reservoir replacement project. The project includes demolition of an existing 150,000 gallon clear well, construction of a nominal 150,000 gallon epoxy coated bolted steel water storage reservoir, piping and telemetry.
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)