ME - Brownfields Cleanup and Shoreline Stabilization project at the Liberty Shipyard site in South Portland,
Quote from John on January 4, 2026, 8:07 AMBrownfields Cleanup and Shoreline Stabilization project at the Liberty Shipyard site in South Portland, Maine. The work consists of shoreline stabilization work (targeted demolition, regrading, and placement of riprap anchoring materials) and constructing a cover system over impacted soils at the Site. In-water work must occur prior to March 15, 2026, and the project must be completed prior to May 29, 2026.
Obtain specs and info to this, and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
Brownfields Cleanup and Shoreline Stabilization project at the Liberty Shipyard site in South Portland, Maine. The work consists of shoreline stabilization work (targeted demolition, regrading, and placement of riprap anchoring materials) and constructing a cover system over impacted soils at the Site. In-water work must occur prior to March 15, 2026, and the project must be completed prior to May 29, 2026.
Obtain specs and info to this, and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)