MD - Aberdeen: WWTP clarifier demolition.
Quote from John on March 8, 2026, 9:37 AMAberdeen: WASTEWATER TREATMENT PLANT PRIMARY CLARIFIER #2 IMPROVEMENTS. The scope of this project requires a qualified trade professional to remove specific existing clarifier components, install replacement equipment in coordination with the manufacturer. The Contractor shall responsibly remove and dispose of all materials and debris from the clarifier demolition.
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
Aberdeen: WASTEWATER TREATMENT PLANT PRIMARY CLARIFIER #2 IMPROVEMENTS. The scope of this project requires a qualified trade professional to remove specific existing clarifier components, install replacement equipment in coordination with the manufacturer. The Contractor shall responsibly remove and dispose of all materials and debris from the clarifier demolition.
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)