Forum Navigation
You need to log in to create posts and topics.
CA - Harbor Dpt, Port of Los Angeles: Berths 167-169 Phase II Marine Oil Terminal Project consists of demolition of existing timber wharf structure, co
#1 · March 29, 2026, 9:04 AM
Quote from John on March 29, 2026, 9:04 AMHarbor Dpt, Port of Los Angeles: Berths 167-169 Phase II Marine Oil Terminal Project consists of demolition of existing timber wharf structure, construction of new steel catwalks, and other Work as shown on Drawing No. 1-3498. Engineering Estimate: $8,000,000 - $9,000,000
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)
Harbor Dpt, Port of Los Angeles: Berths 167-169 Phase II Marine Oil Terminal Project consists of demolition of existing timber wharf structure, construction of new steel catwalks, and other Work as shown on Drawing No. 1-3498. Engineering Estimate: $8,000,000 - $9,000,000
Obtain specs to this and hundreds more bids at http://www.envirobidnet.com Try a 30 day free trial (no credit card required)