South Bound Brook: D...
Quote from John on August 31, 2025, 8:18 AMSouth Bound Brook: Demolition and Remediation of Former Black Belt Inc. Site, 161 Edgewood Terrace. The project generally consists of demolition and complete removal of the existing building, structures, and miscellaneous debris at 161 Edgewood Terrace (Block 20 Lot 6), removal of underground storage tanks, excavation and proper offsite disposal of contaminated soils, backfill and restoration, and all other associated work and services in accordance with the Contract Documents.
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com Try a THIRTY DAY FREE TRIAL (no credit card required)
South Bound Brook: Demolition and Remediation of Former Black Belt Inc. Site, 161 Edgewood Terrace. The project generally consists of demolition and complete removal of the existing building, structures, and miscellaneous debris at 161 Edgewood Terrace (Block 20 Lot 6), removal of underground storage tanks, excavation and proper offsite disposal of contaminated soils, backfill and restoration, and all other associated work and services in accordance with the Contract Documents.
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com Try a THIRTY DAY FREE TRIAL (no credit card required)