Quote from John on August 31, 2025, 8:07 AMLogansport Utilities: Demolition of the Exide concrete building pad, soil remediation and site restoration. The Project will be conducted in Five (5) Stages, defined and outlined as follows: Stage 1 Pre-Demolition Work will include all notifications, insurance, and project documentation. The scope also includes mobilization, utility identification, erosion control and permits. Stage 2 Soil Excavation and Disposal A limited excavation of approximately 600 tons of chlorinated solvent (TCE) and lead impacted soil will be removed from the site. The soil shall be excavated, loaded into roll off boxes, and disposed of as either hazardous or non-hazardous waste (under an IDEM contained-in determination) based upon soil sample results collected during waste generation. Stage 3 Soil Excavation, Treatment, and Disposal Remediation and disposal of approximately 8,700 cubic yards of lead impacted soil at the site. The soil shall be treated on-site per the bid specifications in order to properly dispose of the soil at a subtitle D (non-hazardous waste) landfill. Some of the lead impacted soil may be disposed of at a hazardous waste landfill. Stage 4 Demolition Demolition of the Former Exide building will include demolishing the former building pad (approximately 218,000 sq. ft. / 5.0-acres), removing all footers, and crushing of all the onsite concrete.
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com Try a THIRTY DAY FREE TRIAL (no credit card required)
Logansport Utilities: Demolition of the Exide concrete building pad, soil remediation and site restoration. The Project will be conducted in Five (5) Stages, defined and outlined as follows: Stage 1 Pre-Demolition Work will include all notifications, insurance, and project documentation. The scope also includes mobilization, utility identification, erosion control and permits. Stage 2 Soil Excavation and Disposal A limited excavation of approximately 600 tons of chlorinated solvent (TCE) and lead impacted soil will be removed from the site. The soil shall be excavated, loaded into roll off boxes, and disposed of as either hazardous or non-hazardous waste (under an IDEM contained-in determination) based upon soil sample results collected during waste generation. Stage 3 Soil Excavation, Treatment, and Disposal Remediation and disposal of approximately 8,700 cubic yards of lead impacted soil at the site. The soil shall be treated on-site per the bid specifications in order to properly dispose of the soil at a subtitle D (non-hazardous waste) landfill. Some of the lead impacted soil may be disposed of at a hazardous waste landfill. Stage 4 Demolition Demolition of the Former Exide building will include demolishing the former building pad (approximately 218,000 sq. ft. / 5.0-acres), removing all footers, and crushing of all the onsite concrete.
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com Try a THIRTY DAY FREE TRIAL (no credit card required)