Idaho Falls: Elevate...
Quote from John on August 17, 2025, 8:21 AMIdaho Falls: Elevated Water Tank Demolition DESCRIPTION OF WORK: The work consists of the demolition of the 0.5 million gallon (MG) legged elevated tank, approximately 185 feet tall. The tank is located within the campus of Idaho Falls Power. The project will generally include demolishing the tank and associated features, proper disposal, including hazardous waste disposal of lead-coated tank parts, as well as surface restoration of pavement and other finished surfacing and above-ground features that were disturbed during the project. The project has an expected duration of 6 weeks after the Notice to Proceed. The engineer’s opinion of probable cost is presently estimated between $200,000 and $500,000
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com Try a THIRTY DAY FREE TRIAL (no credit card required)
Idaho Falls: Elevated Water Tank Demolition DESCRIPTION OF WORK: The work consists of the demolition of the 0.5 million gallon (MG) legged elevated tank, approximately 185 feet tall. The tank is located within the campus of Idaho Falls Power. The project will generally include demolishing the tank and associated features, proper disposal, including hazardous waste disposal of lead-coated tank parts, as well as surface restoration of pavement and other finished surfacing and above-ground features that were disturbed during the project. The project has an expected duration of 6 weeks after the Notice to Proceed. The engineer’s opinion of probable cost is presently estimated between $200,000 and $500,000
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com Try a THIRTY DAY FREE TRIAL (no credit card required)