Sheridan: 4 MILLION GALLON TANK REHABILITATION PROJECT. This project consists of the reconstruction of the concrete roof for the 4-million gallon concrete water tank at the Sheridan Water Treatment Plant. A post-tensioned roof will be used. Also included is the installation of baffles in the tank, reinforcement of the columns, the demolition of the existing roof, site piping, and other associated work.