Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WY - Laramie County, selective demolition
January 9, 2011
5:52 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Pre-qualification Questionnaire Instructions for Goins Elementary School Replacement and Prairie Wind Elementary School Cheyenne, Wyoming. Goins Elementary School Replacement Construction of a new two-story, 49,993 square feet elementary school, including, but not limited to, a slab on grade, masonry, brick veneer, steel frame structure; metal decking and single-ply roofing system; mechanical, plumbing, electrical, audio visual, CATV, technology cabling; gymnasium, food service kitchen, instructional classrooms; interior finishes including but not limited to, drywall, suspended acoustical ceilings, VCT, carpeting, window coverings, doors, windows, hardware, casework, and associated furnishings, fixtures, and equipment. Site Work including, but not limited to, demolition and removal of the existing building, site grading, detention area, utilities, curb and gutter, paving, landscaping, exterior and site lighting, drive lanes, fire lane and parking lot paving. Cost Estimate: $10,000,000 - $13,000,000. Prairie Wind Elementary School Construction of a new two-story, 66,989 square feet, elementary school, including, but not limited to, a slab on grade, masonry, brick veneer, steel structure; metal decking and single-ply roofing system; plumbing, electrical, mechanical and, audio visual, CATV, technology cabling; gymnasium, food service kitchen, instructional classrooms; interior finishes including but not limited to, drywall, suspended acoustical ceilings, VCT, carpeting, window coverings, doors, windows, hardware, casework, and associated furnishings, fixtures, and equipment. Site work including, site grading, detention area, utilities, curb and gutter, paving, landscaping, exterior and site lighting, drive lanes, fire lane and parking lot paving. Cost Estimate: $11,000,000 - $15,000,000. Bids due 01/19

Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
84 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar