Building Demolition and Parking Lot Rehabilitation. Project consists of building demolition of two buildings. A 5,025 SF building and a 16,900 SF building shall be demolished with new landscaping and asphalt pavement installation. Additional parking lot work including excavation, crushed base, curb and gutter, and misc site work shall be performed. Other site and miscellaneous work are landscaping, irrigation system installation and parking lot striping. Proposed work is located at 537 10th Street in Evanston, WY. Bids due 05/14