Clearmont: LEITER DITCH REHABILITATION PROJECT for the Lower Clear Creek Irrigation District.The project consists of the demolition, removal, and disposal of existing irrigation structures including a concrete measurement flume, portion of a concrete drop structure, slide gate, and trees within an existing irrigation ditch. Construction includes canal cleaning, earthwork, drainage improvements, head gate repair, slide gate replacement, trash rack installation, rock diversion structure, erosion control, slope stabilization, remove and reset existing 9'-9" x 6'-7" structural plate pipe, and miscellaneous work on 2.30 miles of the Leiter Ditch Irrigation Canal. Alternates in this project include the installation of approximately 1,800 LF of 78" (12 gage, Aluminized Type 2) CMP and 78" (Class II) RCP.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
25 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950