Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WY - Clearmont: LEITER DITCH REHABILITATION PROJECT
August 5, 2018
9:31 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Clearmont: LEITER DITCH REHABILITATION PROJECT for the Lower Clear Creek Irrigation District.The project consists of the demolition, removal, and disposal of existing irrigation structures including a concrete measurement flume, portion of a concrete drop structure, slide gate, and trees within an existing irrigation ditch. Construction includes canal cleaning, earthwork, drainage improvements, head gate repair, slide gate replacement, trash rack installation, rock diversion structure, erosion control, slope stabilization, remove and reset existing 9'-9" x 6'-7" structural plate pipe, and miscellaneous work on 2.30 miles of the Leiter Ditch Irrigation Canal. Alternates in this project include the installation of approximately 1,800 LF of 78" (12 gage, Aluminized Type 2) CMP and 78" (Class II) RCP.

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
25 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar