Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WY - Casper: Parks Pedestrian Bridge Repairs. Streambank restoration utilizing 47 cy import & place restorative fill, remove and reset 3 bridges, remove 42" flar
January 5, 2025
8:56 AM
Avatar
Admin
Forum Posts: 7070
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Casper: Parks Pedestrian Bridge Repairs. Streambank restoration utilizing 47 cy import & place restorative fill, remove and reset 3 bridges, remove 42" flared end section (FES), reset 42" FES, and site reclamation. Alternate work may include demo 1 wooden abutment, abutment excavation, construct 1 bridge abutment with 4 cy concrete, install erosion control of 122 sy 8 oz non-woven geotextile, import & place 54 cy 12" riprap, import and place 10 cy 24" riprap, shorten 42" RCP, construct 124 sf 2' block wall, import and place 19 cy wall backfill 3/4" washed aggregate, and install 42 sy block wall biaxial geogrid

Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
34 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3043

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20071

Posts: 28305

Administrators: JOHN: 7602, John: 7070

Skip to toolbar