Casper: Parks Pedestrian Bridge Repairs. Streambank restoration utilizing 47 cy import & place restorative fill, remove and reset 3 bridges, remove 42" flared end section (FES), reset 42" FES, and site reclamation. Alternate work may include demo 1 wooden abutment, abutment excavation, construct 1 bridge abutment with 4 cy concrete, install erosion control of 122 sy 8 oz non-woven geotextile, import & place 54 cy 12" riprap, import and place 10 cy 24" riprap, shorten 42" RCP, construct 124 sf 2' block wall, import and place 19 cy wall backfill 3/4" washed aggregate, and install 42 sy block wall biaxial geogrid
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
34 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3043
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20071
Posts: 28305
Administrators: JOHN: 7602, John: 7070