Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WY - Campbell: school and site demolition
December 9, 2012
7:09 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Stocktrail Elementary - Demolition. The work generally consists of the demolition of the existing elementary school building, the removal of mobile units, removal of all hardscape on the site including concrete sidewalks, asphalt pavement, curb and gutter, trees and other amenities as shown in the construction drawings. The work also includes capping and the removal of a portion of the utilities, sawcut and repair Stocktrail Avenue to cap water service line, and regrading and restoration of disturbed project areas for a complete project. The Contractor shall be responsible for removing all demolished items from the site and proper disposal of items. Contractor shall be responsible for material and labor for capping and removal of designated service lines. The Contractor shall also be responsible to provide materials and labor for all street repairs, sub-base and base courses and all restoration efforts Bids due 12/19

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
117 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar