Pre-qualified subcontractor bids for work on the Big Piney Elementary School, Big Piney, WY. The Project includes the following Bid Packages: General Construction 1, Earthwork and Site Utilities 2A, Foundations - 3A, Reinforcing Material - 3C, Slabs, Steps, and Misc. Concrete - 3E, Masonry - 4, Steel Material - 5, Steel Erection - 6, Gypsum Board Assemblies - 7A, Acoustical Ceilings - 7C, Architectural Metal - 8B, Membrane Roofing - 8D, Doors and Hardware - 9, Aluminum Doors, Windows, and Walls - 10, Overhead Doors and Grilles - 11A, Tubular Skylights - 11F, Painting, Wall Covering, and Sealants - 12, Ceramic Tile Flooring and Ceramic Wall Tile - 13A, Wood Flooring - 13B, Resilient Flooring and Carpet - 13C, Concrete Stain and Sealant - 13F, Architectural Casework - 14A, Prefabricated Partitions - 16A, Food Service Equipment - 16E, Gymnasium Equipment - 16F, Window Coverings - 16G, Telescoping Stands - 16H, Elevators - 17A, Mechanical - 18, Electrical - 19A, Landscaping and Irrigation Systems - 20B, Asphalt Pavement - 21A, Site Concrete - 21B, Asbestos Abatement - 23A, Building Demolition - 23B, Playground Surface - 24A, Playground Equipment - 24B All prospective subcontractors must receive notice from Groathouse Construction, Inc. that they are pre-qualified Bids due 01/24
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
100 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950