Project consists of the demolition of the two (2) existing 500,000 gallon ground welded steel water tanks, the construction and commissioning of two (2) 700,000 gallon composite elevated factory coated bolted steel water tanks, a new valve vault, site piping, electrical improvements, reconnection of an existing fire hydrant, miscellaneous site work, removal and replacement of perimeter fence, removal of the existing valve vault and is identified as Contract No. 2 - Water System Improvements; Corporation of Shepherdstown Water Storage Tank and is shown on Contract Documents prepared by Chapman Technical Group. Bids due 04/12
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
78 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030