New Haven: Water System Improvements Contract 1 (Water Distribution) and Contract 2 (Water Tank). The work to be bid upon is described as follows:Contract No. 1The Work will include approximately 12,058 Linear Feet of 8-inch, 41,181 Linear Feet of 6-inch, and 15,400 Linear Feet of 2-inch waterline, 29,847 Linear Feet of Service Lateral, 44 Fire Hydrant Assemblies, 110 Gate Valves, 746 Meter Settings, One (1) Pressure Reducing Station w/ Vault, One (1) Air/Vacuum Relief Valve w/ Vault, Two (2) Water Storage Tank Demolitions, Two (2) Well Rehabilitation/Redevelopments, Two (2) Well Pump & Motor Replacement, One (1) Pump House Rehabilitation, and all necessary appurtenances for a complete project, and as identified as Contract No. 1 - Water System Improvements, and as shown in contract documents prepared by Chapman Technical Group.Contract No. 2The Work will include approximately 2,500 Linear Feet of 8-inch waterline, 2,400 LF of Stone Access Road, 1 Fire Hydrant Assembly, 2 Gate Valves, One (1) Master Meter w/ Vault, One (1) 450,000 Gallon Water Storage Tank, 300 LF of Fence w/ Gates, 25 LF of 12" Steel Casing Pipe, and all necessary appurtenances for a complete project, and is identified as Contract No. 2 - Water System Improvements, and as shown in contract documents prepared by Chapman Technical Group. . .
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
25 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950