Demolition of Existing Hospital Building, all finishes, site paving and landscaping. Chester J. Yanik, Associates, Inc. has been pre-selected as the Construction Manager at Risk by BMH Inc. and is therefore making Invitation to receive Bid Proposals for Multiple Contracts to be submitted for the above referenced project. Bid Proposal shall be accepted for: 1. Site Work and Excavations. 2. Site Utilities. 3. Building Concrete. 4. Masonry. 5. Structural and Miscellaneous Steel. 6. General Construction, including demolition of the existing hospital building, all finishes, site paving and landscaping. 7.Roofing, Flashings and Sheet Metal. 8. Aluminum Entrances, Storefronts, Curtain wall, Windows and Glazing. 9. Mechanical Construction. 10. Plumbing Construction. 11. Fire Protection. 12. Electrical Construction Bids due 12/18
Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
41 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950