WI DOT: RAZING AND REMOVING BUILDINGS 1. Parcel 1: Razing and removing a 3,840 SF commercial building which includes an 1,185 SF concrete storage building. Any, and all other relevant surrounding improvements and debris, if present. Asbestos, if present, must be removed Parcel10: Razing and removing a Two story, 2,268 SF single family house with a three-car detached garage, miscellaneous fire damaged dilapidated outbuildings, above ground storage tank for oil heat, in- ground pool, concrete patios, concrete/asphalt driveway, well, access walks, curbs and steps
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card require
Most Users Ever Online: 429
Currently Online:
50 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950