West Bend: Former Gehl Engineering Building Demolition. Significant type of work and approximate quantities include: Building Demolition and Removal - 1 LUMP Sum; Remove Buried Footings and Foundations - 2,500 CY; Unclassified Excavation - 750 CY; Furnish and Install Granular Backfill - 2,500 CY; Overexcavation - 250 CY; Furnish and Install Soil Reinforcing Fabric - 300 SY; Furnish and Place Topsoil, Seed, Fertilizer, Mulch and Water, 6" - 5,000 SY; Furnish and Install Erosion Control - 1 LUMP Sum Contract 15-13 is a unit price contract. Bids due 07/23