Waushara County: Demolition and removal of the South Annex building, formerly Waushara Training School. The building is located at 205 W. Elm St. Wautoma WI 54982. Asbestos abatement and lead removal are already done. Work consists of tearing down the existing building and removal of the building materials. All concrete, including the basement walls and floor, is to be removed and the basement hole filled in with clean fill. The building foot print will need to be filled in with 12 inches of limestone compacted to 95% density for a parking lot. Abandonment of water service and sanitary lateral required.
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
44 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090