Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WI - Waukesha: RAZING AND REMOVING BUILDINGS
November 1, 2015
6:29 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Waukesha - DTSD: RAZING AND REMOVING BUILDINGS 1. Parcel 15: 5,640 SF one-story, restaurant building housing a sit-down restaurant on concrete slab foundation. Features wood frame construction, and a brick, wood-panel and fiber-panel exterior. Concrete access walks, slabs and steps if applicable. Remove front and sides of dumpster enclosure (back will remain in place). Remove two concrete barriers in front of dumpster enclosure. Decorative metal fencing on patio area. Neon pole sign, footings, sign face, and lighting. Exterior lighting. Municipal water and sanitary sewer (water turned off at curb and meter pulled by Wauwatosa Water Utility August 4th, 2015 (414) 479-8964). Concrete/asphalt paving areas (driveway/parking) may remain unless disturbed or damaged during demolition. Note 1: Final grade, finish surface layer with approximate 2" depth of compacted crushed gravel, stone or concrete (dense grade

Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
105 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar