Sturgeon Bay: 2020 West Waterfront Promenade Demolition, Abandonment and Removal of Existing Site Amenities. Site Grading. Storm Sewer Reconstruction. Sanitary Sewer and Water Service. Timber Overlook, Seating Terrace, Concrete Stairway and Marine Bollards. Pedestrian Light Poles, Bases, Marine Electrical/Water Pedestals and Conduit /Wiring. Asphalt Pavement Overlays and Concrete Pavement Walkways. Landscape Amenities including Limestone Seating/Retaining Walls, Visual Screening. Fence, Landscape Plantings and Trees, Topsoil, Seeding, Mulching.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
39 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950