Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WI - Rice Lake: FEEDMILL DEMOLITION w/hazmat
November 24, 2019
9:05 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Boyceville: FEEDMILL DEMOLITION Removal and disposal of asbestos containing materials plus regulated wastes, demolition of existing building including removal of subsurface foundations and related structures plus removal of existing at-grade structures such as sidewalks, parking lots, tennis courts and related features. The work also includes hauling and disposal of demolition materials, site grading, backfill and compaction to restore the site to a uniform ground surface profile matching the approximate elevation of the adjacent streets, plus related work including unclassified excavation, trucking, erosion control, site cleanup, and related miscellaneous construction.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
18 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar