Mineral Point: 310 High Street Demolition Project: The project consists of demolishing the existing buildings on site and creating a green space / buildable lot. Description of Work: This project includes all materials, associated labor, and associated costs but is not limited to: the demolition of an approximate 6,200 square foot single level building with a full basement, removal several trees, the capping of all existing utilities, filling of existing basement with compacted material, grade site for positive drainage, landscaping, seeding, and any required permits.
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
98 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090