Milwaukee MSD: Deconstruction, Salvage, and Demolition of Structures on 1436 E. Forest Hill Avenue Property (Quest Project #5988271): The project contemplated consists of deconstruction (Base Bid) or demolition (Alternate Bid) of structures and removal of soil stockpiles at 1436 E. Forest Hill Avenue, Oak Creek, Wisconsin. The work at this property includes disconnection and abandonment of utilities (well and septic system), removal of asbestos containing materials and other regulated materials prior to deconstruction or demolition, placement of fill, regrading to maintain site surface drainage patterns, removal of soil stockpiles including approximately 6,400 tons of Impacted Material and 1,300 tons of Non-Impacted Material, and 15,000 SY surface restoration including 4-inches of imported topsoil. The existing major structures at the site include a two-story residential structure with no basement (approximately 5,750 SF), remnants of two greenhouse structures (5,300 SF), a greenhouse structure (approximately 7,400 SF), and a steel pole barn/garage (approximately 3,200 SF).
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
57 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950