DEMOLITION OF DREGNE RESIDENCE. 532 8th St N & CAMPUS INN 232 6th ST N. LA CROSSE, WISCONSIN. In general, the Project consists of demolition and removal of all debris from a single house located at 532 8th Street North in La Crosse and two (2) buildings at 232 6th ST N known as the Campus Inn. Work shall include removal of structures, slabs, pavement and basement foundations, filling excavations, and disconnection and removal of all utilities as indicated and/or discovered. All asbestos abatement has been completed. 532 8th ST: Backfill building and slab areas and compact with suitable soil to within 6 inches of grade at east property line. Remove soil at entire area of lot, compact sub-base and Install 6 inches of gravel base for parking. Match elevation at perimeter of lot. 232 6th ST N: Fill and compact excavations with suitable soil per specifications, matching surfaces/grade at perimeter of site. Construction waste management will be a requirement for both sites per Section 01 74 19. The 6th ST N site will have some LEED requirements that need to be recorded. Refer to Section 01 10 00 for details. Lump-sum Bids will be received on a SINGLE PRIME CONSTRUCTION CONTRACT FOR THE ENTIRE WORK including mechanical and electrical work Bids due 07/02
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - sign up for a FREE 30 DAY TRIAL to see more jobs you may be missing
Most Users Ever Online: 429
Currently Online:
76 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950