Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WI - Baraboo: removal of existing bridge,
November 6, 2016
5:33 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Lafayette: Finch Avenue over Bailey Creek Structure B-41-97 (Quest Project #4621691) The work for which bids are asked includes the following: grading, base aggregate dense, riprap heavy, removal of existing bridge, CIP concrete piling, structure B-41-97 and all incidental items necessary to complete the work as shown on the plans and included in the contract. The Contractor may determine the schedule for this work except that all work on the project must be completed between May 15, 2017 and August 31, 2017 and within 40 consecutive working days after the start of work

Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
97 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar