WSDOT: SR-520 Montlake to Lake Washington I/C and Bridge Replacement Project Description: This Bid package is for the demolition of the Montlake Blvd. Bridge over the SR-520 and the 24th Ave. Bridge over the SR-520. Both bridges will need to be fully removed including all superstructures, substructures and foundations. Each bridge will be removed during a full weekend freeway closure (1 closure per bridge). The SR-520 freeway will need to be protected during demolition.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
19 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950