Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Wenatchee: selective demolition
January 6, 2013
7:05 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Construction of the new WestSide High School. Scope of Work includes: Renovation and modernization of an existing building located at 1510 9th Street., Wenatchee Washington to house WestSide High School. The existing 18,600 sf building was originally designed and built as the Wenatchee Eagles Lodge. Program includes classroom spaces, office, learning center, kitchen, circulation, support spaces, and various other improvements as may be required to allow building to function as a high school, including additions of windows, new entry, and cosmetic changes. Construction consists of, but is not limited to: selective demolition; some new foundations, new interior metal stud walls; new window and door systems, both interior and exterior; new entrance; and site improvements as may be required. Building is to receive new electrical systems, plumbing fixtures, upgraded fire suppression system, new kitchen equipment; and other miscellaneous improvements Bids due 01/31

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
76 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar