TUKWILA: Urban Renewal Motel Demolition. The Work to be performed within 180 calendar days from the date of Notice to Proceed consists of furnishing all materials, equipment, tools, labor, and other work or items incidental thereto for: Demolition and site reconfiguration of three (3) motel properties and one (1) retail property, including but not limited to: removal of site structures and improvements, cutting/capping of utilities, abatement of regulated materials, profiling/removal/disposal of accumulated potentially hazardous waste materials (paints, lacquers, cleaning chemicals. etc.), removal of one (1) approx. 60” dia retention pipe, removal of concrete and asphalt paving, installation of new chain link and cedar split rail fencing, re-contouring of exsiting grades using available soils on site, import of gravel borrow and topsoil as necessary, limited installation of new drainage structures and piping and illumination, and other work necessary to complete the Work Additive work of a similar nature for one (1) additional motel that is included in a separate schedule may be awarded if elected by the City
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online:
83 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950