Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - STILLAGUAMISH: RIVER ROCK PHASE 2 FUELING
April 22, 2018
9:19 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

STILLAGUAMISH: RIVER ROCK PHASE 2 FUELING This Project is the second phase of an existing convenience store. Phase two work consists of complete demolition of an existing two-story building, and one existing single-story building and foundations. Area of each building is 5470 SF and 1370 SF. Upon demolition, construction will begin of a new 2,900 square foot fuel canopy. Within the canopy footprint, 4 fueling islands for automobiles will be installed. This work consists of adding new underground tanks with related piping, fuel dispensers, concrete and asphalt paving, canopy with structural supports. Civil and electrical work is included.

Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
66 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar